HOSPITALITY · BESS · BENGALURU · BREWERY

Powering Premium Hospitality with Silent, Diesel-Free Backup Energy

A fully integrated 250 kW / 482 kWh Battery Energy Storage System delivering seamless backup power, improved guest experience, lower operating costs, and sustainable operations.

LocationBengaluru, Karnataka
IndustryHospitality, Brewery & Event Venue
JEM Energy Battery Energy Storage System deployed at Uru Brewpark, Bengaluru

The Challenge

Uru Brewpark, a luxury brewery, premium restaurant, and large-format event venue in Bengaluru, required a reliable backup power solution capable of supporting hospitality operations and brewery equipment without compromising customer experience. Traditional diesel generators created challenges including noise, emissions, fuel dependency, maintenance overhead, and rising operating costs.

01

250 kVA critical load requirement

02

Mixed resistive and inductive industrial loads

03

Pumps and VFD-driven brewery operations requiring stable power

04

Minimum 2-hour backup requirement

05

Noise disturbances affecting customer ambience

06

Diesel emissions in a premium hospitality environment

07

High maintenance and fuel dependency

08

Risk of operational disruptions during power outages

JEM Energy Solution

JEM Energy deployed a fully integrated Battery Energy Storage System (BESS) engineered specifically for commercial hospitality operations. The system was seamlessly integrated with existing electrical infrastructure to provide silent, pollution-free backup power while supporting critical hospitality and brewery operations.

482 kWh
Battery Energy Capacity
1
250 kW Battery Energy Storage System deployment
2
482 kWh usable energy storage capacity
3
Provides up to 2 hours of uninterrupted backup power
4
Integrated with existing 415V, 3-phase, 4-wire electrical infrastructure
5
Supports pumps, VFDs, brewing equipment, and hospitality loads
6
Silent operation during grid outages
7
Automatic diesel generator switchover after battery depletion
8
Air-cooled architecture designed for Indian operating conditions
9
Low-maintenance operation with 10-year system life
10
Plug-and-play deployment utilizing existing panel room infrastructure

Proven Results

The deployment delivered measurable operational, financial, and environmental benefits while significantly improving the venue’s customer experience and operational reliability.

5,300+ kWh
Clean Energy Delivered
💰
₹1.69 Lakh
Diesel Cost Savings
♻️
4.09 Tonnes
CO₂ Emissions Avoided

Replacing noisy diesel generators with silent battery-based backup power has significantly improved the ambience and operational efficiency of the venue.

Kuncheria Marattukalam
Co-founder
Uru Brewpark

Backup Capability

Up to 2 Hours of Continuous Backup

Technical Specifications

Battery Storage

Power Rating250 kW
Energy Capacity482 kWh
Backup Duration2 Hours
Cooling TypeAir-Cooled

Electrical Integration

Supply Configuration415V, 3-Phase, 4-Wire
InfrastructureIntegrated with Existing Panel Room
DG CompatibilityAutomatic DG Switchover
Load CompatibilityResistive & Inductive Loads

Operational Performance

Supported EquipmentPumps, VFDs & Brewery Operations
System Life10 Years
MaintenanceLow Maintenance
OperationSilent Backup Power

Deployment

Installation TypeOutdoor Commercial Deployment
CommissioningSeamless Integration
Environmental PerformanceOperated Through Summer Heat, Storms & Hail
ArchitecturePlug-and-Play Energy Storage Platform

Ready to transform your energy strategy?

Let's explore how JEM Energy can deliver similar results for your facility.

Schedule a Consultation